James “Tracy” Wooley
Home (979) 548.0202
307
S
Hackberry
*Cell (979) 709.7589
Sweeny,
Texas
Work
Summary:
· A knowledgeable,
detail-oriented professional offering my expertise in all phases of Planning
/ Scheduling TAR’s, ( all Arenas of Project Controls ), Construction ( Grass
Roots, Revamp, Capital Projects) and Project Management.
· Create and update
fully integrated Engineering, Procurement, & Construction resource loaded
schedules (Utilizing Primavera 6.0).
· Maintained and
developed resources, resource calendars, calendars and other various tasks
within P6 User Fields.
· Experience
includes, but not limited to field planning, scheduling, cost control,
estimating, & change management in the following areas: Engineering,
Procurement, Construction, Turn-arounds and Start-ups.
· Industries worked
in include petrochemical, chemical, refinery, gas processing, pipelines,
upstream and downstream facilities.
· Experienced in the
utilization of Primavera 2.1 to 8.3, Suretrak, Project, SAP and other sources
of software within a Windows environment.
· Well versed in
working independently or as a team member.
Education:
Brazosport High School
Freeport, TX
Brazosport, College
Clute, TX
Professional Experience:
Lauren EC
Aug 2012 – Feb 2014
Corporate Project Controls Coordinator
· Maintain corporate
P6 data base.
· Develop P6
corporate company scheduling procedure.
· Create and update
fully integrated Engineering, Procurement, & Construction resource loaded
schedules (Utilizing Primavera).
Power sector (Solar/Simple
Cycle/Repowering)/Chemical/Process):
· Enel Green – New
Mexico.
· Linde (Several
locations).
· CF Industries
(Donaldsonville, LA).
· STEC (Edinburg,
Texas).
· Navajo Refinery
(Artesia, NM).
· Held weekly and
bi-weekly live schedule update meetings.
· Loading and
updating of the engineering progress system.
· Manpower planning
and forecasting.
BP America’s – Houston, TX
Mar 2012 – Aug 2012
Primavera Administrator
· Maintain P6 codes
and coding structures.
· Download P6 on
North America Gas (NAG) personnel computers.
· Configured data
bases on (NAG) personnel computers.
· Developed and
Maintained P6 Procedures.
· Maintained and
developed resources, resource calendars, calendars and other various tasks
within P6 User Fields.
Valero – Houston, TX
Oct 2011 – Mar 2012
TAR Scheduler
· Imported data base
activities into P6.
· Scheduled
activities within refinery scope.
· Critiqued and
modified activity resources, calendars and codes.
Elkhorn Construction, Inc
Jan 2011 – Oct
2011
Planner/Scheduler – COP Pipeline
Maintenance – Small Capital Projects
· Create and update
fully integrated Engineering, Procurement, & Construction resource loaded
schedules (Utilizing Primavera 6.0).
· Weekly live
schedule update meetings.
· Plan/Schedule
Maintenance and Small Capital Projects.
· Manpower planning
and forecasting.
· Implementation and
usage of the Management of Change process.
· Cost tracking and
reporting.
· Manage all field
activities.
· Liaison with Client
and Elkhorn.
· Project Management
roles – responsibilities.
· Project Bid Walks
and Construction Project Kick Off.
Shell Oil and Gas on Shore, North America –
Houston,
TX
Sept 2009 – Jan 2011
Field Scheduler – (TIC $350 MM)
· Create and update
fully integrated Engineering, Procurement, & Construction resource loaded
schedules (Utilizing Primavera 6.0).
· Held weekly and by
weekly live schedule update meetings.
· Managed Contractor
Schedules and Implemented into Master Schedule.
· Manpower planning
and forecasting.
· Implementation and
usage of the Management of Change process.
· Cost tracking and
reporting.
· Developed Monthly
Project Reports in house and client level.
Commonwealth Engineering and Construction
Jun 2008 – Sept 2009
Senior Scheduler – Carisal Project (TIC
$200MM)
· Create and update
fully integrated Engineering, Procurement, & Construction resource loaded
schedules (Utilizing Primavera 3.1).
· Held weekly and by
weekly live schedule update meetings.
· Loading and
updating of the engineering progress system.
· Manpower planning
and forecasting.
· Implementation and
usage of the Management of Change process.
· Cost tracking and
reporting.
· Developed Monthly
Project Reports in house and client level.
Commonwealth Engineering and Construction
Mar 2007 – Jun 2008
Senior Scheduler – Calumet Project ($250
MM)
· Review and validate
construction contractor schedules.
· Created resource
loaded master schedule (Utilizing Primavera 3.1).
· Cost tracking and
reporting.
· Field verifies
physical progress per schedule updates.
· Work with
Project/Area Managers on the execution of scheduled activities.
Universal Ensco, Inc. – Engineering Firm,
Gas Pipeline
Oct 2005 – Mar 2007
Project Controls Functional Manager - DC
Pipeline Project – Enbridge, Inc. ($265MM)
· Created detailed,
resource loaded pipeline schedules (Utilizing Primavera 5.0).
· Maintained detailed
progress within schedules.
· Monitored all
contractor activities.
· Cost control and
reporting.
· Document controls –
Development and Maintenance.
· Weekly Progress
Reporting at Client level.
Solutia, Inc. – Petro-Chem.
Jul 2002 – Oct 2005
Turnaround Planner / Scheduler - Coordinator
- 3 – 4 TAR Yearly ($1 – 5MM)
· Plan / Schedule all
aspects of TAR’s –
· Field estimate each
individual job, man hour estimate, materials all steps involved
· Coordinated all S/D
items (Inspection, Engineering and Maintenance).
· Scheduled and
coordinated all S/D jobs – Purchasing and fabrication logistics.
· Coordinated
contractors (all crafts) crew sizing and supervision.
· Created detailed,
resource loaded turnaround schedules (Utilizing Primavera 3.1).
· Controlled all
aspects of S/D – Implementation – Coordination – Execution – Finalization.
Marathon Ashland Petroleum - Refinery
Oct 2001 – Jul 2002
Turnaround Piping Coordinator
· Coordinate
all piping items (Inspection, Engineering and Maintenance).
· Schedule and
coordinate pipe jobs – Purchasing and fabrication logistics.
· Coordinate
contractors – Crew sizing and supervision.
· Pipe and materials
tracking from drawings to installation.
GE Power Systems – Simple Cycle Power Plant
Jun 2000 – Oct 2001
Project Controls Engineer ($265MM)
· Created detailed,
resource loaded construction schedules (Utilizing Primavera 3.1).
· Established and
maintained detailed physical progress measurement system.
· Monitored
subcontractors and approved monthly invoices.
· Set-up and
maintained Cost Engineering and forecasting utilizing Prolog.
· Expedited material
deliveries to maintain schedule and cost control.
Zachry Const. Corp. – Mobil/Off Gas
Facility
Jul 1999 – Jun 2000
Project Controls Representative ($200MM)
· Responsible for
development of physical progress systems.
· Developed and
maintained Project Schedules (Utilizing Primavera 2.1).
· Maintained time and
cost
projection.
U. S. Contractors – BASF – Petro-Chem.
Jan 1984 – Jul 1999
T/A - Planner/Scheduler - 2 – 4 TAR Yearly
($1 – 5MM)
· Responsible for
scheduling of T/A activities.
· Created detailed,
resource loaded turnaround schedules (Utilizing Primavera 2.1).
· Responsible for T/A
implementation.
· Maintained time
boundaries in productions schedule.
· Procurement of all
fabrication needs.
· Planned and
estimated each activity per production job scope.
· Responsible for
scheduling work force throughout pre-post T/A.
· Responsible for
coordination of heavy equipment per T/A.
· Responsible for
each phase of T/A – Development phase through final clean up.
· Scheduled and
executed equipment repairs and fabrication.
· Responsible for
employment process – Hiring, screening, training and terminations.
· Coordinated,
planned and executed all stages of T/A.
· Coordinated T/A
procedures and operations needs – Pre-Post T/A.
· Coordinated outside
vendors – Fabrication, scaffolding, insulation, hydro-blasting, etc.