From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:53 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

James Wooley 

Last updated:  02/06/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Sweeny, TX  77480
US

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Planner / Schedule - Controls Specialist

Resume Value: 4hwgkp69yrzi5muw   

  

 

James “Tracy” Wooley                                                                                           Home (979) 548.0202

307 S Hackberry                                                                                                           *Cell (979) 709.7589

Sweeny, Texas                                                                                                        Work

 

 

Summary:

·         A knowledgeable, detail-oriented professional offering my expertise in all phases of Planning / Scheduling TAR’s, ( all Arenas of Project Controls ), Construction ( Grass Roots, Revamp, Capital Projects) and Project Management. 

·         Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 6.0).

·         Maintained and developed resources, resource calendars, calendars and other various tasks within P6 User Fields.

·         Experience includes, but not limited to field planning, scheduling, cost control, estimating, & change management in the following areas: Engineering, Procurement, Construction, Turn-arounds and Start-ups.

·         Industries worked in include petrochemical, chemical, refinery, gas processing, pipelines, upstream and downstream facilities.

·         Experienced in the utilization of Primavera 2.1 to 8.3, Suretrak, Project, SAP and other sources of software within a Windows environment.

·         Well versed in working independently or as a team member.

 

Education:

Brazosport High School

Freeport, TX

Brazosport, College

Clute, TX

 

Professional Experience:

Lauren EC                Aug 2012 – Feb 2014

Corporate Project Controls Coordinator

·         Maintain corporate P6 data base.

·         Develop P6 corporate company scheduling procedure.

·         Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera).

Power sector (Solar/Simple Cycle/Repowering)/Chemical/Process):

·         Enel Green – New Mexico.

·         Linde (Several locations).

·         CF Industries (Donaldsonville, LA).

·         STEC (Edinburg, Texas).

·         Navajo Refinery (Artesia, NM).

·         Held weekly and bi-weekly live schedule update meetings.

·         Loading and updating of the engineering progress system.

·         Manpower planning and forecasting.

 

BP America’s – Houston, TX               Mar 2012 – Aug 2012

Primavera Administrator

·         Maintain P6 codes and coding structures.

·         Download P6 on North America Gas (NAG) personnel computers.

·         Configured data bases on (NAG) personnel computers.

·         Developed and Maintained P6 Procedures.

·         Maintained and developed resources, resource calendars, calendars and other various tasks within P6 User Fields.

Valero – Houston, TX               Oct 2011 – Mar 2012

TAR Scheduler

·         Imported data base activities into P6.

·         Scheduled activities within refinery scope.

·         Critiqued and modified activity resources, calendars and codes.

 


 

 

Elkhorn Construction, Inc                Jan 2011 – Oct 2011             

Planner/Scheduler – COP Pipeline Maintenance – Small Capital Projects

·         Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 6.0).

·         Weekly live schedule update meetings.

·         Plan/Schedule Maintenance and Small Capital Projects.

·         Manpower planning and forecasting.

·         Implementation and usage of the Management of Change process.

·         Cost tracking and reporting.

·         Manage all field activities.

·         Liaison with Client and Elkhorn.

·         Project Management roles – responsibilities.

·         Project Bid Walks and Construction Project Kick Off.

 

Shell Oil and Gas on Shore, North America – Houston, TX              Sept 2009 – Jan 2011

Field Scheduler –   (TIC $350 MM)

·         Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 6.0).

·         Held weekly and by weekly live schedule update meetings.

·         Managed Contractor Schedules and Implemented into Master Schedule.

·         Manpower planning and forecasting.

·         Implementation and usage of the Management of Change process.

·         Cost tracking and reporting.

·         Developed Monthly Project Reports in house and client level.

 

Commonwealth Engineering and Construction               Jun 2008 – Sept 2009             

Senior Scheduler – Carisal Project (TIC $200MM)

·         Create and update fully integrated Engineering, Procurement, & Construction resource loaded schedules (Utilizing Primavera 3.1).

·         Held weekly and by weekly live schedule update meetings.

·         Loading and updating of the engineering progress system.

·         Manpower planning and forecasting.

·         Implementation and usage of the Management of Change process.

·         Cost tracking and reporting.

·         Developed Monthly Project Reports in house and client level.

 

Commonwealth Engineering and Construction               Mar 2007 – Jun 2008 

Senior Scheduler – Calumet Project ($250 MM)

·         Review and validate construction contractor schedules.

·         Created resource loaded master schedule (Utilizing Primavera 3.1).

·         Cost tracking and reporting.

·         Field verifies physical progress per schedule updates.

·         Work with Project/Area Managers on the execution of scheduled activities.

 

Universal Ensco, Inc. – Engineering Firm, Gas Pipeline               Oct 2005 – Mar 2007   

Project Controls Functional Manager - DC Pipeline Project – Enbridge, Inc. ($265MM)

·         Created detailed, resource loaded pipeline schedules (Utilizing Primavera 5.0).

·         Maintained detailed progress within schedules.

·         Monitored all contractor activities.

·         Cost control and reporting.

·         Document controls – Development and Maintenance.

·         Weekly Progress Reporting at Client level.


 

 

Solutia, Inc. – Petro-Chem.               Jul 2002 – Oct 2005

Turnaround Planner / Scheduler - Coordinator - 3 – 4 TAR Yearly ($1 – 5MM)

·         Plan / Schedule all aspects of TAR’s –

·         Field estimate each individual job, man hour estimate, materials all steps involved

·         Coordinated all S/D items (Inspection, Engineering and Maintenance).

·         Scheduled and coordinated all S/D jobs – Purchasing and fabrication logistics.

·         Coordinated contractors (all crafts) crew sizing and supervision.

·         Created detailed, resource loaded turnaround schedules (Utilizing Primavera 3.1).

·         Controlled all aspects of S/D – Implementation – Coordination – Execution – Finalization.

 

Marathon Ashland Petroleum - Refinery               Oct 2001 – Jul 2002

Turnaround Piping Coordinator

·         Coordinate all piping items (Inspection, Engineering and Maintenance).

·         Schedule and coordinate pipe jobs – Purchasing and fabrication logistics.

·         Coordinate contractors – Crew sizing and supervision.

·         Pipe and materials tracking from drawings to installation.

 

GE Power Systems – Simple Cycle Power Plant               Jun 2000 – Oct 2001

Project Controls Engineer ($265MM)                                                   

·         Created detailed, resource loaded construction schedules (Utilizing Primavera 3.1).

·         Established and maintained detailed physical progress measurement system.

·         Monitored subcontractors and approved monthly invoices.

·         Set-up and maintained Cost Engineering and forecasting utilizing Prolog.

·         Expedited material deliveries to maintain schedule and cost control.

 

Zachry Const. Corp. – Mobil/Off Gas Facility                Jul 1999 – Jun 2000

Project Controls Representative ($200MM)                                                         

·         Responsible for development of physical progress systems.

·         Developed and maintained Project Schedules (Utilizing Primavera 2.1).

·         Maintained time and cost projection.             

             

U. S. Contractors – BASF – Petro-Chem.               Jan 1984 – Jul 1999

T/A - Planner/Scheduler - 2 – 4 TAR Yearly ($1 – 5MM) 

·         Responsible for scheduling of T/A activities.

·         Created detailed, resource loaded turnaround schedules (Utilizing Primavera 2.1).

·         Responsible for T/A implementation.

·         Maintained time boundaries in productions schedule.

·         Procurement of all fabrication needs.

·         Planned and estimated each activity per production job scope.

·         Responsible for scheduling work force throughout pre-post T/A.

·         Responsible for coordination of heavy equipment per T/A.

·         Responsible for each phase of T/A – Development phase through final clean up.

·         Scheduled and executed equipment repairs and fabrication.

·         Responsible for employment process – Hiring, screening, training and terminations.

·         Coordinated, planned and executed all stages of T/A.

·         Coordinated T/A procedures and operations needs – Pre-Post T/A.

·         Coordinated outside vendors – Fabrication, scaffolding, insulation, hydro-blasting, etc.

 

 

 

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Corporate Planner / Scheduler

Laureen Engineering and Constructors

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Date of Availability:

Immediately

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Job:

Target Job Title:

Planner / Scheduler

 

Target Company:

Company Size:

Industry:

Construction - Industrial Facilities and Infrastructure
Management Consulting Services

Occupation:

Manufacturing/Production/Operations

·         Production/Operations Planning

IT/Software Development

·         Database Development/Administration

·         Enterprise Software Implementation & Consulting

 

Target Locations:

Selected Locations:

US-TX-Houston

Relocate:

No